Your project changes daily. Your risk analysis should too.

SP4N ingests drawings, specs, schedules, RFIs, contracts, and vendor data, then turns them into a live project intelligence layer that adapts as weather, crews, suppliers, and scope change.

Per-activitygranularityPer-runre-scoringSource-linkedfindings
INTEL CONSOLE · SAMPLE PROJECTsample · 12:00:00 AM
risk queue · rankedsample data
A-04Foundation pour
flagged
risk 82·rain window · slip probable
A-09Curtainwall set
six-figure
risk 61·shop-drawing lag flagged
A-13Interior finishes
watch
risk 34·trade stacking flagged
weather watch▲ pour risk
MTWTFSS
systems
MEP rough-in
Structural
Enclosure
groundedevery finding source-linked · none assumed
Capabilities · predict / learn / assess

Three engines, one source-linked control layer.

§ 01 / capabilities
01
capability
Predict

Intelligent predictions.

Construction-specific reasoning modules combine your schedule, documents, weather context, and supplier signals to flag risks before they land.

LiveWeather + systems24/7Monitoring
PREDICT · weather × schedule
pour window · A-04 Foundationat risk
MON
10%clear
TUE
30%stable
WED
85%delayed
THU
60%watch
FRI
25%stable

prediction · WED rain front pushes the A-04 pour past its cure window → resequence MEP sleeves to THU to protect the critical path.

02
capability
Learn

Grounded in your project record.

Construction-specific reasoning modules are grounded in your project record - every finding is anchored to a source document, computed from schedule math, or explicitly labeled as an assumption.

PDF · XERCore inputsSourceLinked findings
LEARN · grounded findingssource-linked
finding · scope gap

The subcontract omits through-wall flashing at head conditions required by the enclosure package - a six-figure exposure if discovered after mobilization.

DWG-07SPEC-02the subcontract
source · SPEC-02

Provide continuous flashing

at sill and jamb conditions.

Provide through-wall

flashing at head w/ end

dams & weeps per detail.

Coordinate w/ masonry.

grounding94%
03
capability
Assess

Project intelligence reviews tied to live changes.

A ranked list of what slipped, what's at risk, and exactly what to do about it - per activity, with the reason why.

LiveReviewsAuditTrail
ASSESS · daily reviewrun 1/1/2026
1
Foundation pourdelayed
rain front · WED cure window lost
2
MEP sleeves L4delayed
coordination clash w/ structural embeds
3
Elevator raildelayed
vendor lead-time extended
Capability · ROI

Built for measurable ROI.

§ 02 / value
0%
01
of findings
Source-linked

Findings tied to project evidence.

$0.0M
02
median / project
$
d
risk
Dollar + day

Exposure estimates on findings.

0
03
engine runs / mo
12:04:11 · run #1248 · ok
findings linked
awaiting field…
Audit trail

Every engine run is logged.